Ford / JLR / Mazda part family

GG9C-14C648

The VBF flash files of GG9C-14C648 in the CARTESIAN database (Vehicle Dynamics Control Module), fitted in Ford. Each file has its own page with its facts and is ordered there for 20 €; in the CARTESIAN app the files come with the ULTIMATE plan.

Brand
Ford
Module
Vehicle Dynamics Control Module
Type
VBF

Files of GG9C-14C648

Every version in the database; open a file for its details.

Part noModuleTypeEngine / modelNetwork / dateSizeDetails
GG9C-14C648-AAVDMVehicle Dynamics Control ModuleVBFSoftware--17.13 KB›
GG9C-14C648-ABVDMVehicle Dynamics Control ModuleVBFSoftware--17.13 KB›
GG9C-14C648-BAVDMVehicle Dynamics Control ModuleVBFSoftware--17.13 KB›
GG9C-14C648-BBVDMVehicle Dynamics Control ModuleVBFSoftware--17.13 KB›
GG9C-14C648-CAVDMVehicle Dynamics Control ModuleVBFSoftware--17.13 KB›
GG9C-14C648-CBVDMVehicle Dynamics Control ModuleVBFSoftware--17.13 KB›
GG9C-14C648-MAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›
GG9C-14C648-NAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›
GG9C-14C648-PAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›
GG9C-14C648-RAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›
GG9C-14C648-SAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›
GG9C-14C648-TAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›
GG9C-14C648-UAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›
GG9C-14C648-VAVDMVehicle Dynamics Control ModuleVBFSoftware--17.11 KB›

About this file type

VBF is the flash container of the Ford, Jaguar Land Rover and Mazda tools: a file carries one block of a module's software (the program, a calibration, a bootloader) with the address it is written to and its checksum; PHF, BIN, ENC and DAT are the older formats of the same tools. CARTESIAN lists them on the FORD/JLR tab of its Database and, with the ULTIMATE plan, downloads them and converts a VBF to a plain .bin with every block in its place.

This file and every other file of the FORD/JLR tab are included in the CARTESIAN app with the ULTIMATE plan.